Achen-Gardner Construction demonstrates the installation of Ultraviolet Light (UV) Cured-In-Place Pipe (CIPP) as part of the Small Diameter Sanitary Sewer Rehabilitation Project with the City of Scottsdale. The project is a Job Order Contract that includes the rehabilitation of 65,000 LF of 8-inch to 12-inch VCP and associated lateral connections using UV CIPP technology.
Link to this comment:
All Comments (0)