A walkthrough of CtrlS Datacenter, Mumbai!

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
3,951
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Sep 6, 2011

Our datacenter specs:
• 2 lakh sft. of datacenter space
• 20,000 racks space ensures scalability for over a decade
• Load bearing capacity of 2,100kg/sqm
• 5-layered 2 hr fire rated server room partitions with thermal insulation
• Earthquake resistant seismic zone level 3 designed shell (though requirement is only for level 2)
• Dual active power sources
• In-house 18 MW gas-based power plant
• Onsite 48 MVA substation
• 210 KL HSD tanks capacity (expandable)
• Design PUE of 1.43 (lowest in India & APAC region)
• N+N redundant specs
• 8-zone security (crash barriers, watch towers, baggage scanners, biometric access, man traps)
• Internet Exchange Platform (IXP) datacenters
• Carrier neutral bandwidth
• Lowest latency in India
• Total Ownership' work culture
• Complete suite of datacenter services
• 1000 BCP seats
• 99.995% uptime SLAs
• 30 % savings on TCO
• NASSCOM Emerge 50 award winner

Category:

Science & Technology

Tags:

License:

Standard YouTube License

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • I don think even Raskspace has all these options..

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more