Gateway Upgrade Project

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
4,451
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Aug 10, 2007

The Gateway Bridge duplication and motorway upgrade.
http://www.brisbanedevelopment.com/

  • likes, 1 dislikes

Link to this comment:

Share to:

Uploader Comments (soulvisionq1)

  • I cannot wait until this is finished ! it looks so good to travel on too. Had enough of all the kaos and traffic reports about the Gateway. Thx for posting.

  • No problem! ;)

    Its going to be such a massive transport corridor when built. 12 lanes on the bridges - 6 each way!!

see all

All Comments (12)

Sign In or Sign Up now to post a comment!
  • waste of time. brisbane is the most rapid growing city in australia! in 2 years we will be back at squre one! it wont be finished by 2011 because they will close the old bridge for a year to resurface it. we will have to buy toll cards which will probably be a min $30 and you might only use the bridge once a year!! its alll about the money!!!!! fuckers.. if we had a say in anything, things would be ALOT better

  • The ICB,s northern end runs into two major thoroughfares which are controlled by traffic lights for several kilometres, this increases another already congested road. I really can,t believe that traffic/road engineers can fuck it up so badly without the Govt. having the final say.

  • This is a fabulous bit of marketing. The construction/engineering/archi­tects etc. companies must be rubbing their hands with glee.The Qld Govt in it,s typical wisdom will throw billions of dollars at building motorways,tunnels,bus only corridors,the ICB and airport roundabout-this has been an ongoing disaster from day one.The ICB,s city end has a set of traffic lights, which send the motorist into an already congested mess.

  • Gee... I never thought anyone would bother putting this up here. Bit of a nice surprise so thanks :)

    p.s. the client has since increased the number of lanes in some areas

  • if your on it 1 lol

  • dickheads 2011 AND STILL MAKING 2 LANE EACHWAY ROADS they made this mistake in the same spot in the eighties 2 million ppl later and they are doing the same thing again!!

  • how many tools will be along the road

  • both of those reasons and also they wanted or i should say need better roads if brisbane wants to hold the olympics

  • hurry up, overtime, the gateways the worst road in australia

  • was this just to catch up or are they expecting continous mass immigration?

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more