Level 9 Earthquake Resistance: diagonal bracing structure, light weight,
steel construction, passed level 9 earthquake resistance testing
6x Less Material: even though the construction materials are much
lighter(250kg/m2) than the traditional materials(over 1500kg/m2), the floors
and walls are solid with surefootedness, airtight and sound-proofing
5x Energy Efficient: 150mm thermal insulation for walls and roofs, triple
glazed plastic windows, external solar shading, heat insulation, fresh
air heat recovery, LED lighting, yearly HAVC A/C energy consumption
equivalent to 7 liters oil.
20x Purification: after 3 levels of purification, the purification efficiency
for fresh air reaches 95%-99.9%; air exchanged 1-2.5 times per hour, and
indoor air is 20x cleaner than out door air
1% Construction Waste: all components are factory made, construction
waste, mainly package materials, result from on site set-up only and
amount to 1% of the total weight of the building.
This is the first building in human history which combines almost all
environmental friendly, comfortable and secure elements. So, we call it:
Sustainable Building
we need to stop china from doing this, otherwise too many people will lose there job. hey china stop.
kynaan09 1 month ago
6 days may be but 2 nooo!!!!!!
yaskacade 1 month ago
i would like to see inside too.
dayax11 1 month ago
Congratz, with all my heart.
AnthonyAlphasy 1 year ago
Look this zalukaj.pl/polecony,529376/
Zayac09 1 year ago
@ZeroRive
90 hours
means somthing like 4 days
aimensayadi 1 year ago
6 days not 2 :)
ZeroRive 1 year ago
ils sont fort les chinois
umibooozu 1 year ago
a fundacao deve ter comecado antes. é o que mais demora.
lgfraga 1 year ago
what about the drilling in the ground?
i didnt see them digging-in foundations.
erez1979 1 year ago