Bradshaws Ultra Heavy Haulage used their Mack Titan, 2 501 Kenworths and a 950 Kenworth plus with help from Doolans NH580 Volvo, moved a 322 ton transformer from the wharf in Melbourne to Loy Yang power station in the Latrobe Valley. They travelled down the off ramp at Heatherton rd along the wrong way of the freeway 200mts then crossed through the median strip where we had to pull down the wire safety rope so they could cross over to the right side and continue to Officer to park up for the day.
Link to this comment:
All Comments (0)