The first "test" running of trains on the layout

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
43,159
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Feb 5, 2007

Finally have enough track down and a PowerCab to use to run Trains on the layout. "Short and sweet" trains, many to test for bad spots and get the kinks out.

Category:

Entertainment

Tags:

License:

Standard YouTube License

  • likes, 3 dislikes

Link to this comment:

Share to:

Uploader Comments (myowngod2)

  • Love your train layout! Was wondering what code of track you are running code83?

  • @disturbed1954 You're correct. We use code 83, Atlas flex, with primarily Atlas #6's and a few #4's. Also a few Walther's/Shinohara curved turnouts and Peco curved.

  • and how many trains can you run at any one time

  • @jmsschooner We have run 4 trains at one time. One of those was a double head F-7 unit. So, 5 trains running with another 4-5 sitting on the track idle.

  • nice set bud is it all dcc

  • @jmsschooner , Yes. We use the NCE Powercab system.

see all

All Comments (12)

Sign In or Sign Up now to post a comment!
  • Nice set up!

  • nice,  set wish my train set looked like yours cool

  • great video a lot futher than I I just have track and a few loco and some rolling stock just about it lol cant wait for a place to buld a layout thank god for the carpent I hop it softend the fall great looking layout so fare

  • very nice layout : )

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more