Upload

Loading icon Loading...

This video is unavailable.

How to avoid Cowboy Builders - Using the Desired Outcome Contract Part 2

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like DIY Doctor's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike DIY Doctor's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add DIY Doctor's video to your playlist.

Uploaded on Jun 23, 2011

The final part of the 2 part real life case study where the DIY Doctor Desired Outcome Contract was used in the renovation and extension of a property in Kent to ensure that both parties (the customer and the contractor) were happy with the completed job.

For more information on avoiding cowboy builders visit the DIY Doctor Cowboy Control area: http://www.diydoctor.org.uk/find-trad...

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

The interactive transcript could not be loaded.

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to