Operation - switching H0 model trains

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
16,287
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Dec 9, 2008

Switching at Third Street District with scratch build GE 25-ton.

Category:

Entertainment

Tags:

License:

Standard YouTube License

  • likes, 2 dislikes

Link to this comment:

Share to:

Uploader Comments (westportterminal)

  • What Are The Purple Lines? 0:45

  • @emcamev

    I have no video camera, this is made with a Canon PowerShot A640. The chip can not work with the light from the LED, too much light I think.

  • how do you build an engine from scratch???

  • @MultiHornguy

    from brass sheet, you can read it at NMRA Scale Rails, March 2010, Scratchbuilding a GE 25-tonner

  • How do you keep your track so clean? Your little engine seems to run very well.

  • @tillyb1989

    running trains :-)

Top Comments

  • Are all your locomotives the same road name.

  • Very cool! 5*****!

see all

All Comments (60)

Sign In or Sign Up now to post a comment!
  • This layout has to be by far one of the BEST layouts I have ever seen. Double Contradulations dude.. You definitely have MAD Skills!!

  • Obviously a massive amount of work has produced a spectacular set of scenes... Congratulation on an excellent project... You motivate all modellers to  "Take it to the Max."

  • @westportterminal Oh, Okay!

  • A nicely inspired plot.

  • I don't run mine very often. I'm still laying all my truck out. Any tips on keeping it clean so I can run my trains whenever I want?

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more