Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Building a Generator 1905

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
594 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Aug 17, 2011

A silent film showing stages of building an early AC generator at Westinghouse in Pittsburgh. By 1900 AC power had established itself around the world as the preferred form of electric power. Siemens, Oerlikon, General Electric and Westinghouse were all producing large numbers of generators for a vast number of locations. Some locations were cities for the electric light, some locations which purchased the new expensive capability of electric power included agricultural areas(electricity was used in pumps for irrigation), military sites, mining areas, and isolated factories. Generators were improving by leaps and bounds as corporate competition paid engineers well for their improvements. 3 Phase power was the dominant system as established by pioneer Dobrovolsky a decade earlier.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more