This is a short video of the blower attachment we are offering for our trailers, this was a 1100' run with a 180 degree loop right out of the handhole and then 4 - 90 degree bends at various locations along the run. It took about 4 minutes to blow through that run. We have blown up to 4700' so far in a normal job site setting, up and down hills, through loops in handholes under creeks, etc... This is a very affordable method of putting more cable in the ground in less time.
Link to this comment:
All Comments (0)