Spartan Stores YMCA Animation

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
2,135
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jan 11, 2010

Design Plus has been hired to provide complete architecture and engineering services including architecture, interior design, structural engineering coordination, civil engineering, landscape design, mechanical and electrical engineering, and pool consultant coordination for a new multi-level, 96,000 SF facility including indoor sports and adventure center, gymnasium, pool, fitness center, locker rooms, indoor walking/running track, aerobics/multi-purpose room, child care center, lobby/lounge, administrative offices, wellness center, multi-purpose classroom, chapel, and food court/cafe. Construction costs are estimated at $20,000,000 and the project is in design development with groundbreaking targeted for March 2010 and anticipated completion in 2011. This project is designed for base LEED certification.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (3)

Sign In or Sign Up now to post a comment!
  • @godboleaditya007 Very late response... however about 95% of the building was modeled using Revit Architecture. The materials and camera paths were done with 3ds Max. The entire thing was compiled using Adobe Premiere. There was nearly 20,000 computer hours that went into rendering all of the scenes.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more