Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Reimers Electra Steam, Inc. : JJ Boiler Blowdown Safety

Loading...

Sign in or sign up now!
2,476
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Aug 14, 2007

Turn the boiler off and allow the pressure to drop to 5 psig. Open the blowdown valve for ten seconds, then close. Refill the boiler to the normal operating level. The blowdown procedure should be followed at the end of each working day.

Category:

Howto & Style

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more