Ballasting the Virginia and Truckee Reconstruction Project

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
4,468
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on May 27, 2008

Here are some clips of video I took in American Flat of the Virginia and Truckee Railroad locomotive and hopper car being used to ballast the Virginia and Truckee Reconstruction track . This was shot in April and May, 2008.

Category:

Travel & Events

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (7)

Sign In or Sign Up now to post a comment!
  • @mafarnz ... Now I understand, they throw the ballast at last, then "Plasser & Theurer" is responsible for refining and straightened the details

    thanks for your answer!

  • @aleu650 When RR track was hand laid, a layer of ballast was put down before ties were laid. With modern mechanized equipment, including equipment that can lift a track and place ballast underneath it, it is easer and cheaper to put down track first.

  • @aleu650 The ground has to be level and packed down. The ballast you see around the ties and rails is loose so that water and snow can drain easily.

  • why not put the ballast first ?

  • Very hard core! 5 stars~

  • Thanks SO much...we loved it!!!

  • Amazing video. The landscape is beautiful.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more