How to Frame Basement Walls

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
82,325
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 24, 2010

Visit: http://www.basementfinishingvideos.com for more basement finishing training videos!

Learn the basics for building Basement walls. Learn how to finish your basement yourself. D.I.Y. Basement finishing ideas and training videos.

Visit: http://www.basementfinishingvideos.com for more basement finishing training videos!

  • likes, 2 dislikes

Link to this comment:

Share to:

Uploader Comments (BasementFinishingMan)

  • I've seen some instructional videos that state you need to leave an addition 3/4" at the top to compensate for possible floor movement/expansion, but most, including this one, measure all the way to the bottom of the floor joists. I'm just wondering what your take on this is? Thanks

  • @021cbspear You don't need any space at the top plate in Pennsylvania. Maybe in an area prone to a lot of seismic activity you might be required by code to build a "floating wall system" but not in PA, we build-em tight.

  • Im a little confused, when you are measuring the studs at 102", wouldn't you have to reduce that by 1 1/2" to account for the top frame to attach to the floor joists?

  • @davidzais I am measuring up off of 2 wall plates that stack at 3". So there is your other 1 1/2"!

    Eddie

  • How do you affix the bottom plate to the concrete?

    Do you use tapcons? Can you just use glue?

  • @JimmyDThing We Use a 22 caliber Ramset gun loaded w/ 2 1/2" Concrete nails. Simple and painless. Wear eye and eye protection!

    Eddie

see all

All Comments (48)

Sign In or Sign Up now to post a comment!
  • I still in the need, of finishing the whole basement. But, I have a good start how to do framing. Thanks, now I understand how you do it.

  • @BasementFinishingMan - doesnt the first stud (3.5" in to attach the perpendicular wall to) need a second stud next to it to attach the first drywall? Otherwise the first drywall has nothing to affix to. ?? ie the first X before the line needs an X after the line too

  • @richro65 This was going to be my question also. I believe you are right assuming that you would double the first one up on both sides of the 3 1/2" line. In that case, there should be two "X"s indicated the studs. Good catch.

  • @BasementFinishingMan Definitely would recommend. Perfect for the job!

  • @JimmyDThing Save the hearing brother! Glad the ramset helped out. Things are GREAT aren't they Jimmy!

    Eddie

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more