The Sunlander @ Eumundi
Uploader Comments (qldmatt)
All Comments (13)
-
0:05 Someone went to the toliet
-
HST = High Speed Train... HSFT = High speed freight Train. Just in case =)
-
i now agree.. I've pondered on my comment for some time now and realistically thinking It's just to much effort, time and money now to convert from a narrow gauge and I was recently thinking about Even a Standard Gauge HSR link between Brisbane and Cairns would improve things that's if QR can ever obtain that much profit... Shame I only got 90 cents in the bank lol. I just think it's time for Australia to reconsider a HSR Network on the east coast just for HST and HSFT =)
-
It will cost too much(if you have $500 billion dollars, then go for it).
-
I reckon QR should change their track gauges to the 1435mm Europoean Standard so we can get ICE 3 and AGV Trains ^_^ and make the tracks capable of doing 360Km/h for those fast trains ^_^
-
i love the manual doors once @ townsvile i opened the other side dore to watch the refueling truck go past but i forgot to close the door so it swung open while traveling @ about 80 -100 km hour deffenetly improved air conditioning lol
-
was on the sunlander about 4yrs ago love the trip up and back from Brisbane to cairns. i hate the Economy Class Seats i find them too small so next time I'm going up in a First Class Berth.
i love trains because its slow and don't get packed in like plane.
can't wait to do this trip sometime in the next year or so.
-
I've been on the Sunlander.
Just got off the Sunlander this arvo, hauled by 2211 and 1736.
Colhad 5 years ago
I'm jealous ! I hope there's some pictures or videos ;)
qldmatt 5 years ago
Hmm #936T. I wish we still had the 3900's in general traffic.
QRhuggies 5 years ago
I dont know what im missing, havent seen a 3900 running at pace in the flesh :(
qldmatt 5 years ago