Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Kitchen - Mid-week 8

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
37 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Dec 10, 2008

Almost at the end of the necessary, but not rewarding to look at stuff. Framing and electrical inspections will be done on Monday, and then we can close the walls, after which the real fun begins. Milestones: skylights are in and operable, laundry room has been rebuilt and repaired after the multi-year termite and dry rot fest destroyed everything between the ceiling and the floor, all windows are in and operable, the exterior back door is in, the electrical has been upgraded, the plumbing has been upgraded, the structural reinforcement completed.

Category:

People & Blogs

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more