Almost at the end of the necessary, but not rewarding to look at stuff. Framing and electrical inspections will be done on Monday, and then we can close the walls, after which the real fun begins. Milestones: skylights are in and operable, laundry room has been rebuilt and repaired after the multi-year termite and dry rot fest destroyed everything between the ceiling and the floor, all windows are in and operable, the exterior back door is in, the electrical has been upgraded, the plumbing has been upgraded, the structural reinforcement completed.
Link to this comment:
All Comments (0)