Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

USA n-scale layout with signaling system Part 7

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
14,940
Loading...
Alert icon
Sign in or sign up now!
Alert icon
There is no Interactive Transcript.

Uploaded by on May 12, 2009

Multi-train operations by PC control. On this layout, this double-crossing is a bottle neck for the smooth traffic operations.
パソコン自動運転による両渡りポイントの列車さばきの様子。ここはレイアウト上の全路線が集まるポイントなので運行管理がシビアです。出発条件が整った列車から次々と発進­していきます。

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (tohrus08)

  • Although I like Unitrak, I find it's better to solder the joints to keep a good electrical flow. And i'm certain you love wiring those switches. What a pain that is.

  • I dislike those complicated wirings but anyway it works fine. I don't solder joints on this layout. Instead, I made wirings to rail at many places to divide the track sections for train detection sensors.

see all

All Comments (6)

Sign In or Sign Up now to post a comment!
  • nice amtrak

  • Nice

  • could you plaese e-mail me a schematic of the signals?

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more