Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Revision Of ISO 9001:2008 In ISO 9000 Standards

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
4,426
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Dec 19, 2009

http://www.iso9001store.com

Transition from ISO 9001:2000 to ISO 9001:2008

This reference guide was developed to help you understand the nature of the changes to the ISO 9001 standard.

Clause Change/Emphasis Not Auditable

0.1 General Added language emphasizing statutory and regulatory requirements are a concern as it relates to products for this international standard.

0.4 Compatibility with Other Management Systems Standards - Emphasis was added on the consideration given to ISO 14001:2004 to ensure that the standards are compatible.

1.1 General

1.2 Application Statutory was added in certain paragraphs to ensure the user is aware that these requirements must be taken into consideration. Additional notes were added to explain that where the word product appears, it refers to every stage of its existence, from raw material received to the final product being shipped to the customer.

2. Normative Reference Reference to ISO 9000 (vocabulary and concepts) was updated to refer to the current revision (i.e. ISO 9000:2005).

3. Terms and Definitions The supplier/organization/customer model was removed. These relationships, in reality, are not always linears.

The Auditable Requirements
Clause Change/Emphasis
4.1
In 4.1 a, identify was replaced with determine to emphasize that an organization must give careful consideration to what processes are needed in order to fulfill requirements.
A link is drawn to 7.4 in the additional note. This was done to show that the supplier approval, evaluation, and re-evaluation process is where evidence of controlled outsourced processes should be demonstrated.
4.2.1
References to records and documents were consolidated.
Also, the organization can require records not specified in this international standard that are created and maintained.
4.2.3
Clarification is given to the requirement for outsourced documents. Only those needed for the planning and operation of the QMS need to be controlled. This could exclude documents related to occupational health and safety since ISO 9001 contains requirements only concerned with product (see 0.1).
4.2.4
Rephrased, but no additional clarifications or emphasis added. Editorial change only.
5.5.2
The management representative must be from the organizations management. This would exclude consultants and other individuals external to the organization (e.g. a management representative from the corporate entity). The purpose of this is to ensure that this individual, entrusted with the responsibilities of championing the quality management system, is not out of touch with the organization.
6.2.1
The boundaries of competence only extend to individuals who impact product conformity. However, this does not just include those who are directly involved in production. The decisions made by management affect product conformity; therefore, they must be competent as well.

6.2.2
If said personnel have not yet attained the competence needed to perform the assigned job, then the organization must provide training or some other remedy to ensure that competence is achieved. The organization must also have a mechanism to ensure that personnel have been evaluated based on how well they demonstrate their knowledge and skill (i.e. competence). It is not enough to merely provide training or consider an individuals experience. The organization must prove to itself that this person can, in fact, perform.
For more details go to http://iso9000-quality-management.blogspot.com/

Category:

Science & Technology

Tags:

License:

Standard YouTube License

  • likes, 1 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more