Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Perdido Subsea System

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
2,725
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Apr 25, 2011

http://www.fmctechnologies.com/en/SubseaSystems/GlobalProjects/NorthAmerica/U...

The Shell Perdido is the first full field subsea separation and pumping system in the Gulf of Mexico.

This is FMC Technologies' second full field development with Shell utilizing subsea oil and gas separation and boosting, following the award of the Shell BC-10 project in offshore Brazil. The Perdido project will have a SPAR-based processing hub moored in an estimated 7,874 ft (2,400 m) of water, making it the deepest production SPAR in the world. The Perdido project will utilize FMC's globally managed product standards, supporting manufacturing and supply networks and project management processes.

Category:

Science & Technology

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more