http://www.gikenamerica.com
When in soils which are better penetrated with a water jetting technique, the Giken Silent Piler comes equipped with an innovative solution to controlling the process.
The Water Jet Nozzle holder is welded to the bottom of the sheet pile and the Nozzle is fixed to it with a sheering pin. The water passes threw the Nozzle when the Silent Piler is actively pressing the sheet pile down. During the upstroke, the water is cut off. Once the sheet pile is fully installed, the Jet Real is leaned forward and the Jet Hose is pulled out of the Nozzle Holder by breaking the Sheering Pin.
www.gikenamerica.com
Link to this comment:
Video Responses
All Comments (0)