Uploaded by on Jul 13, 2009

http://www.gikenamerica.com

Channel 05, The Wintersburg Channel
Huntington Beach, CA

This project consisted of approximately 4,000 linear feet of 45 foot long PZ-35 type steel sheet pile which took a total of 18 days to complete. Most days had two 12 hour shifts. The full GRB system was utilized for approximately 2,000 linear feet of the work. Difficult to access areas, hard riving conditions and adjacent environmentally sensitive protected areas were some of the factors which lead the owner to specify the Press-in System. The Project was awarded the PDCA project of the year.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more