Tempe Town Lake boats left in the marina, after the dam broke, needed to be lifted out with a crane to be placed on their respective trailers so they were not left there when the reservoir eventually dries up. The larger AYC Pontoon safety boat is shown being lifted out of the TTL marina by crane and placed on its trailer. It was towed to the boat yard where it will remain while repairs are made to the failed dam.
Link to this comment:
All Comments (0)