Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

1/4 Construction Evans Ct Shoreview Asphalt Paving New Road

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
26,703
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 12, 2007

CLICK MORE http://www.NelsonIdeas.com This is Video 4/4 of the Street Construction research project on Evans Court Shoreview Minnesota using 2 layers of asphalt for paving over new sand replaceing clay the caused street washout under previous attempt to stabilize this road. See my other videos on the removal ofthe clay and filling in wtih sand to build the short street.BrianNelson123 Brian Nelson Building Equipment Road Repair Highway Research New Methods Building Development St. Paul MN Street Construction Evans Ct Shoreview Asphalt Paving Road

  • likes, 1 dislikes

Link to this comment:

Share to:

Uploader Comments (BrianNelson123)

  • who let the car go by

  • That was the state highway inspector. He had to go to the bathroom. Brian

Top Comments

  • I love the smell to! im glade i aint the only one :)

  • @Semitruckman101 Smells like money to me!

see all

All Comments (25)

Sign In or Sign Up now to post a comment!
  • ganyan pala iyan?

  • How much do they dump trucks get paid hauling asphalt?

  • I noticed that the dumptrks never folded their mud flap up prior to backing to the paver...Thats a good way to lose a flap or have material fall off the flap on the road way which is illegal in Calif...

  • how do u like the track paver? i work with a cat wheel paver all the time

  • junk ass old paver guys are all outta shape everything looks beat you guys are slow truck drivers job to clean tailgate must be a fly by company

  • @dgarr64 $32.00 per hour?? i getting ripped off!!!

  • @billwem75

    the tack is along the curb/gutter where the asphalt will meet. The base course can receive a layer of prime coat but some specs will allow for no prime if the asphalt is layed within 7 days and the base meets density.

  • where is the tack

  • the first lift is to the curb yeah dumbasses ...theres this things called a roller that compacts the material below final grade... geez

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more