CONOCO/Phillips refinery detaches number 4 MLA from the cargo manifold of the Oil Recovery Vessel Shearwater and stows the last of their Marine Loading Arms. With the annual hydrostatic testing of four Marine Loading Arms completed the crew of the Oil Recovery Vessel Shearwater returns the remainder of the testing equipment.
Link to this comment:
All Comments (0)