Upload

Loading icon Loading...

This video is unavailable.

Rt.50 and Courthouse Bridge Project

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add arlingtoncounty's video to your playlist.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like arlingtoncounty's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike arlingtoncounty's video.

Loading icon Loading...

Loading icon Loading...

The interactive transcript could not be loaded.

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Published on Mar 26, 2013

The Virginia Department of Transportation (VDOT) project on Arlington Boulevard is replacing the aging Courthouse Road bridge. This project will improve traffic flow and safety at the interchanges on Route 50/Arlington Boulevard at 10th Street and at Courthouse Road. These interchanges were constructed in the early 1950's, are tightly spaced by today's standards, with short acceleration lanes and insufficient capacity for current and future traffic volumes.

The 10th Street and Courthouse Road bridges over westbound Arlington Boulevard will be replaced, and dedicated acceleration/deceleration lanes will be added on Arlington Boulevard, separated from the main roadway. These new lanes will improve traffic flow by managing the merge of entering and exiting vehicles.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to