Upload

Loading icon Loading...

This video is unavailable.

Uponor and the California Academy of Sciences, San Francisco- Case Study

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like UponorNA's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike UponorNA's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add UponorNA's video to your playlist.

Published on Jul 17, 2009

http://www.uponor-usa.com Construction began in 2005 on what has become the largest cultural renovation project in San Franciscos history. A Platinum LEED project, it features PEX-based radiant technology buried in a 4" concrete slab on 38,000 square feet of exhibit area to heat and cool the main floor efficiently and cost-effectively. The radiant system consists of 100,000 linear feet of hePEX™ plus tubing, connected to six 2-million BTU/h boilers and three 4-ton chillers.

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

The interactive transcript could not be loaded.

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to