Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

I-405 - NE 12th Street Girder Setting - Summer 2010

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
3,933
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Aug 11, 2010

Crews closed I-405 in Bellevue, one direction at a time, for four nights during the last two weeks to set the girders over the interstate for the new NE 12th Street bridge. This time lapse video shows some of the work being done. It took 45 men and women to safely place ten 100-ton girders over I-405.

This bridge work is part of a larger project aimed to reduce congestion by building new multi-level "braided" ramps to separate vehicles entering and exiting northbound I-405 between NE 8th Street and SR 520 in Bellevue. More information about the project can be found at: www.wsdot.wa.gov/projects/i405/ne8thtosr520/

Category:

News & Politics

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • This is sicklesteel cranes 650 ton Demag and 500 ton Demag setting concrete girders. Operator of the 500 was jay Kelly and cory Mickelson on the big rig.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more