650m2 double deck stand.
The stand featured open aspect with glass illuminated flooring, 2nd floor with hospitality, hologram, 4 display areas, interactive demo pods.
The project was built and installed in 4weeks. The Project Partnership was responsible for all aspects of design and project management. Scripting, Filming and Post Production was produced by Digicut UK. The stand was built in Singapore.
nice
akajguj 1 year ago