Upload

Loading icon Loading...

This video is unavailable.

IEEE-EWB Wind Turbine First Major Milestone

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like Steve Szablya's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike Steve Szablya's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add Steve Szablya's video to your playlist.

Uploaded on Nov 6, 2010

This is the run after the initial assembly of the wind turbine. As you can see the unit came together very nicely and runs very smooth. Sparkling Apple Cider was shared to celebrate. There was a special toast for those who worked hard, but could not be there to see it all come together. ©2010 Steve Szablya

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to