Bandalong Litter Trap- Anacostia River

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,301
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on May 18, 2009

Storm Water Systems installs the first Bandalong Litter Trap in the U.S. on the Anacostia River in Washington D.C. Video is the story from construction of the litter trap to the unveiling press conference with the Mayor of the District of Columbia.

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (stormwatersystems)

  • This is very cool indeed. All that trash....I wonder how long did it take for the system to trap it?

  • Approximately five days. The trap is emptied weekly by the Earth Conservation Corps. They are logging the amount of trash.

Video Responses

This video is a response to Troubled Anacostia
see all

All Comments (2)

Sign In or Sign Up now to post a comment!
  • This is very cool indeed. All that trash....I wonder how long did it take for the system to trap it?

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more