Oreck reduced fixture costs by 65%using a Fortus 3D Production System. With Direct Digital Manufacturing, the cost to produce assembly pallets is reduced by up to 65%. With some fixture projects costing more than $100,000, the savings are significant.
Link to this comment:
All Comments (0)