Breaking Out Forms

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
6,461
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Mar 5, 2010

Before stripping up the deck, I need to free the hull because it will hard to do later. First I remove the spacer wedges to make the forms free to move on the strongback. Then I rap the forms with a hammer to break the hot-melt glue. There were only a few dots worth on each form so this was not too hard.

For more Information about this technique visit http://www.guillemot-kayaks.com/guillemot/blog/nick/releasing_forms_staple_fr...

This series of videos shows the steps of building a wooden kayak using the "strip-planked" or "strip-built" method. This particular boat is a double paddle canoe design called the microBootlegger by Guillemot Kayaks. More information about the boat is available at http://www.guillemot-kayaks.com . Further information about the building techniques shown in these videos is available in the book "Building Strip-Planked Boats": http://building-strip-planked-boats.com/ For more videos in this series please visit: http://www.guillemot-kayaks.com/guillemot/blog

Category:

Howto & Style

Tags:

License:

Standard YouTube License

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • Does the outside of the hull need to be glassed before you try this?

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more