Development thread is here: http://sc4devotion.com/forums/index.php?topic=13209
A zoom 5 view of the AVE-6 and AVE-8 crossings. The AVE-8 is not going to be in the NWM 2.0 release, but the basic framework is laid down. Since the triple tile networks share components, the crossings have to designed with that in mind.
Link to this comment:
All Comments (0)