Constructing a wind turbine at a cotton seed oil processing plant in Lubbock, Texas.
This video reduces about 9 hours into 40 seconds. One frame every 24 seconds video is 20fps. Sorry for the poor quality, it's a long way off and shot with a webcam. Hopefully will get a better sequence when they build the one in the foreground.
Link to this comment:
All Comments (0)