NS GP40-2 with two RP-E4D slugs drop ballast in North Jct on the west leg of the New Amtrak Wye. Later we Catch 2 NS SD70s headed over Bridge #5 at Harbor Park
@pwalpar Thanks Walter. I almost did some ditch jumping to get to get this video since they had the roads closed and i had to do some shorts cuts before they left lol
@pwalpar Thanks Walter. I almost did some ditch jumping to get to get this video since they had the roads closed and i had to do some shorts cuts before they left lol
tdluvs 3 months ago
good job on this video, it was nice to see the slugs in operation
pwalpar 3 months ago
@trainster100 They are not wired to the circuit yet. They are upgrading the track and circuits to accommodate Amtrak
tdluvs 3 months ago
Lol why weren't the gates going down???
trainster100 3 months ago