LEED Home sip panel NE tipped up

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
11,919
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Dec 21, 2007

Construction of LEED Certified Silver residence

Category:

People & Blogs

Tags:

License:

Standard YouTube License

  • likes, 1 dislikes

Link to this comment:

Share to:
see all

All Comments (10)

Sign In or Sign Up now to post a comment!
  • The Three Stooges build a house ! NO hard hats NO safety harness NO ladder STANDING on a fork-lift

  • HOW THE HELL DID YOU ANCHOR IT TO THE FOUNDATION.

  • are cam-locks assembly not allowed?

  • LMAO OSHA would never approve that man lift , but who the hell cares this is the way its done in the real world . Only thing i can see done wrong is jamming those anchor screws in his nail bag You don't want any sharp crap in your nail bag for when you fall . It happens sooner or later and usually you can just bounce back up

  • That is some big shed

  • Its a messy site to, messy site messy builder

  • No your right, it is asking quite alot from the window lintel to take the entire weight of the panel. And although you cant see on the video to clearly but the panel could slide on the bottom plate and take out "Mr Casual" lerking behind it.

  • If it was me doing it i would have the crane take 90% of the load. You can move 5 ton concrete panels around with a crowbar

  • Boy that dont look to safe

  • I am confused as to how in the world you managed to join the corner of this building into the 2x6 on the corner using such a big piece with the lull. These panels do not slide easily together even in 4 foot sections.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more