Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

CMMI Overview v1.3

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
431 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 6, 2011

In CMMI v1.3 there are changes to the entire product suite, including models, training, and appraisal products. As expected the most substantive model changes are to the high maturity process areas. These include the addition of a new process area, Organizational Performance Management (OPM), at ML5 replacing and expanding OID and the removal of generic goals 4 and 5. To support these changes the specific practices of QPM have been revised to reflect a connection between CAR and QPM.




In addition each model has changes to the core Process Areas (PA) and the PAs specific to them (Acquisition, Engineering, and Service), but these are more modest and there are no major changes to the specific practices in generic goal 2. Category and PA names have changed slightly in each model, particularly in CMMI-SVC where the word 'Project' has been replaced by 'Work' in most cases. In addition language and architecture has been harmonized and aligned wherever possible and the front matter, glossary and informative material have all been improved.

In this free 45 minute presentation by Trinity Management Consultants Adrian Harston talks through a brief overview of these changes and discusses their significance.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more