Oregon 38 Elk Creek Rapid Bridge Replacement

Loading...

Sign in or sign up now!
6,552
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Sep 13, 2008

Time lapse encapsulation. - Slayden Construction, in cooperation with the Oregon Department of Transportation, completed another successful rapid replacement on the OR 38: Elk Creek to Hardscrabble Creek Design-Build Project on September 7, 2008. After months of careful preparation, the process of removing the old bridge, moving the 1220 ton new structure, and re-connecting the highway was performed in only 49 hours (8 hours ahead of schedule). Slayden's excellent safety program insured that everyone working on and visiting the site remained safe on a very congested site.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (4)

Sign In or Sign Up now to post a comment!
  • Well planned and well executed...... I think I'll send a copy of that to the NSW RTA here in Australia....... they could learn a little about getting the job done from it........ *GRIN*

  • Hi slayenconstruction,

    Thank you for this clever video! Great stuff.

    Take care,

    mrbluenun

  • These american engineers and workers are very smart! Congratulations good job

  • What a great video. As a crane operator I have had the opportunity to work with Slayden a few times and found them very professional.

Loading...

0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more