Older area with cast iron pipes, initial flush after 4 weeks of treatment lower elevation area. Accumulated ferric suppressed chlorine residuals to .03 ppm Total. Flushing in this area should have been done in previous two weeks to avoid concentration of deposits. After this flush chlorine residuals increased to .65 ppm Total. Flush cleaned up
Link to this comment:
All Comments (0)