Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

layout Update 9

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
24,258
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Aug 29, 2009

Another update video showing the work in progress on the new layout. Very slow going at the moment due to going out filming etc plus a whole heap of other stuff. Some more work has been done to the layout however since the last update video. This includes, the last of the point motor's being fitted to the lower level baseboards, some ballasting ( to be covered in a later video ) & the fitting of two tunnel mouths & also the tunnel linings, & some adjustment to the track. Plus some more fitting of DCC decoders. Test running is almost complete & we'll be moving on to the next phase which is construction of the upper level baseboards (ten of them to make), & also finishing off the ramp, which will connect the two levels.

Next up date video will appear once the next base board is fitted. Any questions, please feel ask, I'll do my best to answer them for you. Another new video series coming shortly.

  • likes, 4 dislikes

Link to this comment:

Share to:

Uploader Comments (ay76)

  • never have points in a tunnel

  • @10FlyingScotsmans No sorry disagree, yes you can if planned in advance before building, by having removable scenic sections etc. What you have to bear in mind that some times you have to due to space constraints etc.

    Had points (cross over) in a tunnel on a previous layout. Was built with easy access to the points. Never had any problems what so ever.

  • @ay76 Soz, I posted the comment before I saw the other tunnel. I thought it would be longer than that!

  • @10FlyingScotsmans No worries. But your quite right about having them in a tunnel with having some from of access to the points. Regards.

  • how did you wire your dc/dcc switch. - Thanks

  • @OldCrossRailway I'll send you the video, showing how. Cheers.

see all

All Comments (66)

Sign In or Sign Up now to post a comment!
  • @Hartsock91 It had to be all re-insulated, then boarded out etc. Took around a year to do, as funds & time allowed.

  • @ay76 Did you do any modifications to your loft or did you just go up there and start building lol?

  • @Hartsock91 yep.

  • Is your layout in the loft?

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more