Water's Edge Luxury Condos - Clearwater, Florida

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,606
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on May 13, 2010

This is a time lapse video of the construction of Water's Edge 27 story highrise, downtown Clearwater Florida. General Contractors Opus South, with High Rise Concrete Systems subcontracting the concrete structure. Tower Crane - Terex Peiner. Initial height of 200 foot. Two crane jumps of 100 foot each, done by Maxim Crane, R&R Erectors, and Crane Operator (me), with 200,000 lb hydraulic collar jack. Total crane height of 400 foot above Clearwater Bay and the Gulf of Mexico.




Tower Crane was erected on September 22, 2006 and the concrete structure began taking shape. After 14 months, and a lot of hard work, Water's Edge concrete structure was complete. Tower Crane was dismantled in November 2007, and the final completion of project and opening was early 2008.

Credit to Mike Engelmann for the creation of this amazing video and his hard work in making this project successful. Special thanks to Larry Ober, Karl Shane, Ron Saylor, Daniel Rodriguez, Wade Suggs, Jack Brown, Maxim Crane and R&R Erectors for their unprecedented work and dedication to this high rise project's success.

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more