REM Pulling 42" Pipe on a Pipeline HDD in La.

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
19,613
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Dec 7, 2008

This is the final step in an HDD (Horizonal Directional Drill) on a pipeline being installed under Burwick Bayou in Eunice Louisiana on November 21st 2008 by REM . The pipeline is being constructed by Latex Construction and is 132 miles of 42" pipe. The Directional drills are subcontracted out to REM, who is performing the work pictured. This video is the final pull of pipe with a swab in front of it. Burwick Bayou is located in Jefferson Davis Parish in Louisiana. The drag section of pipe being pulled is 931'. R.E.M. Rocks.

  • likes, 1 dislikes

Link to this comment:

Share to:
see all

All Comments (2)

Sign In or Sign Up now to post a comment!
  • very nice work!

  • cool this was put in just two hours west of me

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more