Nestle Slide Rail Install Clip

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,078
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jun 1, 2009

2007 Installation of Slide Rail pit at Nestle Plant in Anderson, Indiana.

This is a short clip of a job by Poindexter Excavating, out of Indianapolis. A pump station had to be installed about 50 feet deep at the new Nestle Plant in Anderson, Indiana. Due to poor soil conditions and limited space on 2 sides of the excavation, we suggested Slide Rail as a shoring solution rather than standard trench boxes or more time consuming sheet piling.

The Pit ended up being a 2-Bay system that measured about 22' x 44' and was around 50 feet deep from starting grade.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more