Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

London 2012's Aquatics Centre in testing

Loading...

Sign in or sign up now!
3,470
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Apr 7, 2010

New video shows construction and testing of the London 2012 Aquatics Centre
New video footage from the London 2012 Olympic Delivery Authority (ODA) shows construction and testing of the Zaha Hadid-designed Aquatics Centre dive pool and two 50 m swimming pools.
The three concrete pools are being tested with over 10 million litres of water before being sealed and lined with 180000 tiles. Testing of the dive pool and training pool is complete and the competition pool starts being filled this week.
Work is also underway lining the unique 160 m-long wave-shaped steel roof, which weighs over 3000 tonnes and rests on just three concrete supports. In the coming weeks cladding will start on the curving timber ceiling and work is continuing on the huge 250 m and 45m wide land bridge that forms the main walking access into the Olympic Park and the roof of the training pool.

  • likes, 0 dislikes

Link to this comment:

Share to:

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more