How to Form and Pour Cantilevered Concrete Video
Loading...
9,314
Loading...
Uploader Comments (hughesjasonc)
see all
All Comments (7)
-
thank you so much i never istalled a pool before i have watch all of your videos and they are so helpfull thank you.you guys rock,Carlos from Albuquerque
-
Wow, what a great video for swimming pool builders and DIY fiberglass pools all over the world. Great job Jason.
Loading...
Jason, how do you remove the styrofoam form after the concrete has set & how long do you allow the concrete to set? Also, at what point do you install the ladder into the concrete? Thanks, Kelley
kelleyslaughter 8 months ago
@kelleyslaughter
We strip the forms the next day, some folks strip as soon as concrete begins to set while still green and finish the coping edge then. To remove, twist the end of the tie until it breaks off, after removing all the ties pull the form away from the concrete. Ladder can be installed day after concrete.....assuming you've installed the anchor. Good luck!
hughesjasonc 8 months ago
Why is there a little lip on the edge? is that suppose to be like that?
MRBOBCATKING 10 months ago
@MRBOBCATKING
It can be finished with or without the lip, depending on whether you pour the concrete to the tip top of the form or leave it down a fraction of an inch. Both ways are fine, as long as it's consistent throughout the entire pour.
hughesjasonc 10 months ago
Thanks Carlos!
hughesjasonc 1 year ago