Tornado II Dredging in Imperial Beach Part 2

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
468 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jun 19, 2011

This video shows Tornado Motion Technologies' dredging in Imperial Beach, CA. This high profile project consisted of dredging 160,000 cubic yards of material while cutting an 8 to 1 slope. Without the use of TMT's terrain following technology this would have been impossible. The percent solids by weight on this dredging project were between 30%-60 percent in situ by volume with about 220-250 cubic yards per hour.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more