Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Hull Wind 2 Up

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
32,418
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Apr 7, 2006

Today, under perfect weather, we watched as all three blades for the newest Wind Turbine in Hull, MA
were installed. It took one hour per blade, just as the Vestas installers told us. Rain moved in after the task was completed.

Category:

Howto & Style

Tags:

License:

Standard YouTube License

  • likes, 5 dislikes

Link to this comment:

Share to:
see all

All Comments (18)

Sign In or Sign Up now to post a comment!
  • nowadays the V90 has athe radiator on top of the nacelle!

  • your right, another way to tell the difference between a V82 from a V80 or 90, the 82 has an external radiator

  • it might be, i was comenting on boetlap who said a 40m blade as a v80 when a 40m blade is a v82

  • i am pretty sure thats a V90

  • hmm, i couldn't tell u that haha

  • i no but wot doz it mean in english??? lol

  • ....apARRENTLY it says 'kaç para acaba bu cihaz bizim iş yerine taksak elektrik sarfiyayı için ii olurdu'

  • they are v82s not v80

  • Hi, I live in Hull GB (UK). We have a two of these massive turbines very close to where I work and there size is unbeleivable.

  • wat da fuk doz dat say?!

    []

    []

    []

    \/

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more