Our pasta bridge project at the University Of Brighton.
Our calculations put the failure at 6.5 kgs but they turned out to be way off as the bridge managed to hold up 13.6 kgs.
It was a hybrid design incorprating elements of an arch bridge and a truss bridge.
Rest in Pieces......
Link to this comment:
All Comments (0)