Hyder was commissioned to develop an existing conditions micro-simulation model for the road network along the entire corridor for the Lane Cove Tunnel project. The Lane Cove Tunnel directly joins Sydney Harbour Bridge.
The model was developed using Quadstone Paramics software and when first completed and calibrated was the largest micro-simulation model (in geographical coverage) yet developed in Australia. The model covered an area of approximately 12 square kilometres.
The model was developed to provide a basis for before and after traffic monitoring for the network surrounding the tunnel, and for assessment of construction management plans for the tunnel construction period.
http://hyderconsulting.com
http://www.paramics-online.com
An awesome ending for a seriously impressive network and video. Well done Hyder Consulting! :)
quadstoneparamics 3 years ago