Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Lane Cove - Hyder Consulting

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,906
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jun 30, 2008

Hyder was commissioned to develop an existing conditions micro-simulation model for the road network along the entire corridor for the Lane Cove Tunnel project. The Lane Cove Tunnel directly joins Sydney Harbour Bridge.

The model was developed using Quadstone Paramics software and when first completed and calibrated was the largest micro-simulation model (in geographical coverage) yet developed in Australia. The model covered an area of approximately 12 square kilometres.

The model was developed to provide a basis for before and after traffic monitoring for the network surrounding the tunnel, and for assessment of construction management plans for the tunnel construction period.

http://hyderconsulting.com
http://www.paramics-online.com

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
  • An awesome ending for a seriously impressive network and video. Well done Hyder Consulting! :)

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more