Beaver 5 Tripping Out
Uploader Comments (edmrb)
All Comments (20)
-
Well, if you could pick a beaver rig to work on it would have to be rig #3, One of the best pushes in the patch by far.........don't get me wrong tony's good too.
-
Well, if you could pick a beaver rig to work on it would have to be rig #3, One of the best pushes in the patch by far.........
-
@s2who there is 4 guys on the floor there, was only 2 when me there. JUSTIFIED GETTING READY!!!!!!!!!!!!!
-
Trinidad 30 seires now fuckers!
-
hey edmrb get me a job !
-
@westcoastsurferguy32 Rigs pay Is Double the pay then most jobs to let you know you must of worked on a shit rig that gave shit money then
-
@edmrb How much you guys get paid in a day? or hour
-
Fuck the mud bucket boys it aint gonna hurt ya to get a little mud on ya! Thats riggin!
-
Thats why they call it beaver drilling cause just a bunch of pussies work for them
-
beaver sucks balls...i worked on 1, 2, & 7, they all where shit...dumbass drillers too left cuz i was sick of haveing drillers wipe me out...eh matt?
lock the elevators 1/4 turn towards pits, run rope from left horn through latch for derrick hand, if your blocks will lock for shit. get ur pusher to pick you up a stripping rubber-push it on the stump with your elevators- latch up- hold the rubber down while pulling a joint- pull bushings-ease rubber below bushings and take off. maybe you know this- maybe you dont. a good slug is always kickass (i love outrunning em). love it!
codyskelton 4 years ago
yeah we do that man, that was right at the start of the trip though and the stripper's usually put on after the first flow check. By your lingo I can tell you are in the US, and not sure if it is required there as here but we have to do a flow check after 5% of the string has been pulled.
edmrb 3 years ago